To replace the current system of pumping sewage into the ship channel on out-going tides, Miami Beach plans to build a 7000 foot long, 50 foot deep sewer outfall. (26 Sep 1936)
Newspapers: Miami Morning News or The Miami Herald
Page: 5, Section: A
To replace the current system of pumping sewage into the ship channel on out-going tides, Miami Beach plans to build a 7000 foot long, 50 foot deep sewer outfall. (26 Sep 1936)
Newspapers: Miami Morning News or The Miami Herald
Page: 5, Section: A