The FEC dredge is finished (10 Jan 1906)

The FEC dredge is finished in bay, the channel is now 120 feet wide and 11 to 17 feet deep. (10 Jan 1906)

Newspapers: Daily Miami Metropolis, The Miami Metropolis (daily), The Daily Metropolis or Miami Daily Metropolis

Page: 1, Section: N/A