The FEC dredge is finished in bay, the channel is now 120 feet wide and 11 to 17 feet deep. (10 Jan 1906)
Newspapers: Daily Miami Metropolis, The Miami Metropolis (daily), The Daily Metropolis or Miami Daily Metropolis
Page: 1, Section: N/A
The FEC dredge is finished in bay, the channel is now 120 feet wide and 11 to 17 feet deep. (10 Jan 1906)
Newspapers: Daily Miami Metropolis, The Miami Metropolis (daily), The Daily Metropolis or Miami Daily Metropolis
Page: 1, Section: N/A